COMPLETED PROJECTS ◄
Construction of 4. Stage Engineering Structures and Road Pavement for Kastamonu Ilgaz Mountain Yurduntepe Facilities
• Supplying, transporting, laying and compacting 1.570.000 m3 of cut excavation and borrow excavation
• Unstacked stone backfilling on 135.000 m3 of swampy wet ground
• Construction of 26.200 m3 of stone wall
• Fabrication of 420.000 tons of plant mix substrate and foundation
• Fabrication of 2.750 m3 of culverts in various sizes using C30/37 reinforced concrete
• Supplying and transporting 13.350 m3 of asphalt gravel