COMPLETED PROJECTS ◄

Construction of Bridge Intersection

• Installation of 978,00 tons of prefabricated beams
• Fabrication, transportation and installation of precast facade panels in every dose for 1.00,00 m3 of reinforced earth (in all sizes and thicknesses)
• Supplying, installing, stretching, loosening and cutting 219 tons of vertical and lateral pre-stressed steel
• Transportation and installation of Ø14-Ø32 mm, 1.380 tons ribbed steel for the fabrication of reinforced concrete
• Fabrication of 103.675 tons of plant mix foundation and sub-foundation
• Fabrication of 60.000 m2 of asphalt concrete with a compacted thickness of 16 cm

PRINCIPAL
Sanliurfa Metropolitan Municipality, Department of Public Works
CONTRACT PRICE
6.826.140,00 $